Hydraulic uids: HLP Mineral oil to DIN 51524 part 2. Biologically degradable uids (gaskets NBR / FPM to clarify with supplier of uid). HFC Reduce pressure to about 70%, re-calculate bearing life. HFD Phosphoric acid-ester, FPM- / FKM -seals are necessary. Filtering: Max. admissible contamination degree of the uid to NAS 1638 class 9, lter recommendation with a minimum retaining value of ²10 e 100. For a long life NAS 1638 class 8, lter recommendation with a minimum retaining value of ² e 5 100. Assembly / attachment: Installation position optional, leakage oil outlet see below. Motor align exactly, fastening screws min. 10.9. For frequent reversing, 2 fastening screws to be used as dowel screws. Coupling: Install the coupling with a screw (not with a hammer). Pipelines: The motor has ange connections SAE J518C 1½“ - 6000 PSI. Use ange acc. to page 23. Leakage line: Before starting ll the motor with hydraulic uid. Lay the leakage line in a way that the motor cannot drain off and no big air bubble builds up within the housing. Flushing: Connect the ushing line (with about 5 - 8 liters/minute, 1.5 bar maximum) in that way that the oil inlet enters at the lowest leakage connection L1 / L2. The drain L3 may be connected into L, or L2, which ever is the return line, via a small 0.5 bar check valve. 2L 1L 3L L1 L = G 3/8 L 3L 0,5 bar max. 2L 3 venting line 2 L1 LSHT Hydraulic Motors RM1000X - RM5000X Assembly and starting instructions 23 www.jbj.co.uk/hydraulic-motors.html #DriveLineHarmony
RkJQdWJsaXNoZXIy NzQyNjQ=